Design
Design
Design.
Tag Assignment
Tag Assignment.
Machine Centre
ADM will work with your plant to define the machine centres, parameters, and metadata for the downtime events.
ADM will obtain and review any current methods existing for collecting downtime events, such as log sheets, Excel sheets, databases, etc.
ADM will identify and develop reason trees based on the relevant initial trigger (real-world I/O), location or sub equipment, problem, root cause, and category required for the downtime events.


